Find Job

Facilities EngineerAsticom

Workplace: MetroManila, Manila, Taguig
Salary: Agreement
Work form: Full time
Posting Date: 09/11/2025
Deadline: 22/08/2020

This job has expired, you can refer to some related jobs below

New Site Site Kick-off Meeting/Pre-con
1. Check and validate RTB/ARTB/SSDS data on actual site condition
2. Check and validate approved DDD on actual site condition
3. Check for possible discrepancy/variation on site (e.g. slope protection, hauling works, etc.)
4. Check for temporary power tapping point and water supply for construction purposes.
5. Validate coordinates
6. Accomplish site evaluation form/Skom Report
7. Validate site access, tempo facilities and safety on site.
Rebar and Concrete Pouring Inspection
1. Verify foundation bedding requirement.
2. Verify foundation thickness and dimension.
3. Inspection of rebar diameter, spacing and splicing requirements based on approved design prior to concrete pouring. Rebar condition should also be check, this should be ensure that are free from rust and oil. Mill certificate and tensile test result should be available.
4. Inspection of embedded and concealed works (Anchor bolts, Nuts and washers, Setting template)
5. Perform slump test and validate result of concrete cylinder samples
6. Monitor actual concrete pouring
7. Ensure safety compliance.
8. Accomplish rebar inspection and concrete pouring checklist.
RFTI Inspection
1. Inspection of facilities
a. Tower - All tower components should be properly installed. Completeness and quality should be checked. Torque test should be performed.
b. Concrete Pads - Should be constructed based on approved drawing. Location should be based on approved plans.
c. Grounding System - should be properly installed and passed grounding test.
d. Cable Ladders
2. Inspection of Power Facilities/Electical System. Tempo power should comply with approved engineering standards.
a. MCB/MTS
b. ACPDB
c. Wires
d. Generator
e. Aviation light
3. Accomplish RFTI checklist
New Site Provisional Acceptance Test (PAT) for CME and TW
1. Ensure that Pre-PAT was performed by Vendor.
2. Check Pre-PAT docs and ensure that all documents provided are complete prior to schedule confirmation.
3. Perform all required test
a. Tower verticality test
b. Torque test
c. Galvanization test
d. Electrical and grounding test
i. Earth resistance test
ii. Wire insulation test
iii. AC Power Distribution Test
e. Grounding system
4. Voltage Standing Wave Ratio (VSWR) test (for feeder solution only)
5. CPRI Installation Inspection
6. BTS installation and commissioning
7. Antenna and RRU installation
8. Rectifier installation and commissioning
9. Environmental alarms simulation test
10. Verify as-built drawing vs approved plan vs actual
11. Complete other activities indicated in the PAT checklist
12. Accomplished PAT checklist.
Permanent Power Provisional Acceptance Test (PAT)
1. Ensure that Pre-inspection was performed by Vendor.
2. Check Pre-inspection report and ensure that all documents provided are complete prior to schedule confirmation.
3. Inspection of Permanent Power Facilities/Electical System.
a. Transformer
b. MCB/MTS
c. ACPDB
d. Wires
4. Verify as-built drawing vs approved plan vs actual
5. Complete other activities and test indicated in the PAT checklist
6. Accomplished PAT checklist.
Tower Retro Site Kick-off Meeting/Pre-con
1. Check and validate approved DDD on actual site condition
2. Check for possible discrepancy/variation on site (e.g. slope protection, hauling works, etc.)
3. Accomplish site evaluation form/Skom Report
Tower Retrofitting Provisional Acceptance (PAT)
1. Performs Nationwide Coordination and Scheduling of Tower retrofit Acceptance as agreed with Civil Works vendor and with GT- Field Ops when needed (SWAT Sites)
2. Ensures test results are within Globe and Industry standards
3. Material Testing
4. Approve Pouring request
5. Backfilling and Compaction test result
6. Dye Penetrant test result
7. Galvanizing results
8. Tower Verticality test result
9. Bolt Torque results
10. Guy Wire re-tensioning results
AC/DC Upgrade Provisional Acceptance Test (PAT)
1. Ensure that Pre-inspection was performed by Vendor.
2. Check Pre-inspection docs and ensure that all documents provided are complete prior to schedule confirmation.
3. Inspection of Permanent Power Facilities/Electical System.
a. Transformer
b. MCB/MTS
c. ACPDB
d. Wires
e. Genset
f. Rectifier
e. Battery
4. Verify as-built drawing vs approved plan vs actual
5. Complete other activities and test indicated in the PAT checklist
6. Accomplished PAT checklist.
Materials Inventory Management
1. Warehouse inspection and delivery inventory
2. Review CDI and COC
About the Company
ASTICOM TECHNOLOGY INC. is an HR shared service company established in March 2015. A part of the Ayala Group, its current services include Staffing Services, Payroll Administration, and Managed Services.
Asticom

Other Info

Taguig City, Metro Manila
Permanent
Full-time

Submit profile

Asticom

About the company

Asticom jobs

Taguig, Metro Manila


Position Facilities Engineer recruited by the company Asticom at MetroManila, Manila, Taguig, Joboko automatically collects the salary of , finds more jobs on Facilities Engineer or Asticom company in the links above

About the company

Asticom jobs

Taguig, Metro Manila

  • Employer support:
  • +84 962.107.888